Several reasons for leaks in container houses

1. During the installation and operation of the mobile room, or the stepping on the roof, loosening the fasteners. The aging of fastener waterproof pads caused water leakage at the fasteners.
2. Unreasonable selection of aging materials and aging during the construction of container houses.
3. There are holes in the panel of the movable room, and the cracks around the installation of various types of fans, exhaust pipes, etc. are not well treated; due to the influence of external conditions during the use of the movable room, wind loads, snow loads, thermal expansion and contraction When the roof slab is deformed, the cracks at the joints will spread, and the original waterproof treatment will be destroyed and water will leak.
4. There is no slope in the gutter of the container house horizontally, the design of the gutter drain is unreasonable, etc. In case of heavy rain, the gutter will not be able to drain back to the gutter inside the gutter when the heavy rain is formed; , Caused the gutter rust and erosion, or dregs and other infarcts such as dregs, and other conditions, there are conditions that can form leakage or backwater.
After talking about these reasons, I believe that everyone can solve them more quickly and quickly.
How to deal with the moisture-proof treatment of assemble container house

1. The horizontal connection of cotton and cotton is connected by a stapler binding method on the veneer flash.
2. Edge the glass wool and install the wall color steel plate;
3. Cut the glass wool roll felt 20 centimeters above the wall top purlin and fix it with double-sided tape.
4. The veneer faces the side of the room, unrolls it from the eaves to the corner, and fixes the glass roll felt to the bottom purlin with double-sided tape, leaving an extra 20 cm.
Speaking here, it is recommended that the container house should also be constructed according to the needs of the project during construction. To avoid the occurrence of cold bridges, roof construction can be considered with some hard insulation materials. During installation, keep the glass wool roll felt tight, aligned, and the seams between rolls are tight. When overlap is required in the longitudinal direction, the overlap should be arranged at the purlin.

Comments

Popular posts from this blog

Tips to Buy the Best Folding Container House

How to choose shipping container

Advantages and disadvantages of container mobile homes